Removable RPJ board allows cCS to provide reservation of streams E1 during operation in high accessibility setting (one central board in standby, another – operating). In case of failure of main board, the system continues to operate using quick switching of E1 streams to the reserve one. Interfaces:
Picture 6: RPJ board
Picture 7: Switching of E1 channels